Forecasting Hydropower Generation in Ghana Using ARIMA Models


  •  Smart Asomaning Sarpong    
  •  Akwasi Agyei    

Abstract

In this study, an Autoregressive Integrated Moving Average (ARIMA) model was used to forecast Ghana’s Akosombo dam level and hydropower generation by the end of year 2022. Data used for this study span from January 2010 to December 2019. Base on the final ARIMA model, power generation is forecasted to decrease from 398 Megawatts/hr in December 2019 to approximately 374 Megawatts/hr by December 2022. On the other hand, water level of the Akosombo dam is predicted to decrease marginally from 264.8 ft in December 2019 to approximately 255.19 ft by December 2022. The Volta River Authority (VRA) and managers of the electricity production in Ghana are encouraged to be proactive in expanding energy production by turning more to renewable energy sources. In the coming years, as they seek to provide sustainable electricity for their cherished customers, investment decisions should be directed towards protecting the volta river from drying up due to human and climatic activities as well as expanding energy mix.



This work is licensed under a Creative Commons Attribution 4.0 License.
  • ISSN(Print): 1927-7032
  • ISSN(Online): 1927-7040
  • Started: 2012
  • Frequency: bimonthly

Journal Metrics

  • h-index (December 2021): 20
  • i10-index (December 2021): 51
  • h5-index (December 2021): N/A
  • h5-median(December 2021): N/A

( The data was calculated based on Google Scholar Citations. Click Here to Learn More. )

Contact