A Mathematical Modeling for Delivery Time in Dynamic PERT Networks
- Mahtab Afsari
- Hesam Javadi Vasigh
Abstract
In project management, the main purpose of proposed methods is project scheduling which helps to management
and planning. We can calculate a real average of project closure in dynamic PERT networks by identifying a
lower limit. According to randomness, each distribution parameter varies itself and also it is proposed that
activity durations are exponential distributions which have casual, unstable and independent variables. We used
hypothetic kinetic programming, that project closure time would have a lower limit. Finally, delivery time would
obtain optimal due date by minimizing the expected aggregate cost per project and also a linear function of its
due-date.
- Full Text: PDF
- DOI:10.5539/mas.v10n3p214
Journal Metrics
(The data was calculated based on Google Scholar Citations)
h5-index (July 2022): N/A
h5-median(July 2022): N/A
Index
- Aerospace Database
- American International Standards Institute (AISI)
- BASE (Bielefeld Academic Search Engine)
- CAB Abstracts
- CiteFactor
- CNKI Scholar
- Elektronische Zeitschriftenbibliothek (EZB)
- Excellence in Research for Australia (ERA)
- JournalGuide
- JournalSeek
- LOCKSS
- MIAR
- NewJour
- Norwegian Centre for Research Data (NSD)
- Open J-Gate
- Polska Bibliografia Naukowa
- ResearchGate
- SHERPA/RoMEO
- Standard Periodical Directory
- Ulrich's
- Universe Digital Library
- WorldCat
- ZbMATH
Contact
- Sunny LeeEditorial Assistant
- mas@ccsenet.org