The Independent Control of Buildings and Structures Breakdowns Risk as a Way of Accidence Reducing


  •  Olga Kaplenko    

Abstract

The article analyzes the risks and causes of breakdowns in construction. The procedure of a risk control is based on knowledge of the risk threshold, which mustn't be crossed. Such values  ​​are independent of the constructive type of a building and number of stories in it. The expert main working tool in controlling breakdowns risk of designed, constructed or used projects should be automated expert system that provides efficiency, reliability and objectivity of the results at the lowest cost of carrying out expert work.



This work is licensed under a Creative Commons Attribution 4.0 License.