Grid Connected PV System Case Study: Jiza, Jordan
- Yousif Tous
Abstract
Jordan is known to be rich in the solar resource with an annual average of 5 peak sun hours, on the other hand it lacks oil and gas resources, in this paper a grid connected PV power plant is designed and simulated using HOMER software, the power plant is sized to supply Al Jiza load, the simulation results showed that a high capital cost is needed and the cost of energy is 0.16 $/kWh which is still high but with incentives and decrease of the PV panels price the system will reach a feasible cost.
- Full Text: PDF
- DOI:10.5539/mas.v6n6p92
This work is licensed under a Creative Commons Attribution 4.0 License.
Journal Metrics
(The data was calculated based on Google Scholar Citations)
h5-index (July 2022): N/A
h5-median(July 2022): N/A
Index
- Aerospace Database
- American International Standards Institute (AISI)
- BASE (Bielefeld Academic Search Engine)
- CAB Abstracts
- CiteFactor
- CNKI Scholar
- Elektronische Zeitschriftenbibliothek (EZB)
- Excellence in Research for Australia (ERA)
- JournalGuide
- JournalSeek
- LOCKSS
- MIAR
- NewJour
- Norwegian Centre for Research Data (NSD)
- Open J-Gate
- Polska Bibliografia Naukowa
- ResearchGate
- SHERPA/RoMEO
- Standard Periodical Directory
- Ulrich's
- Universe Digital Library
- WorldCat
- ZbMATH
Contact
- Sunny LeeEditorial Assistant
- mas@ccsenet.org