Assessment of Investment in Small Hydropower Plants


  •  Perica Ilak    
  •  Slavko Krajcar    

Abstract

In this study an assessment of investments in a hydropower plants is considered. The objective of this work is to maximize the net present value from selling energy. Because of the stochastic nature of river flows, flow duration curve is constructed to take into account hydropower plant capacity factor, important for the assessment of investment. Proposed mixed-integer linear programming model is flexible and accounts for nonlinear three-dimensional (3-D) relationship between the produced power, the discharged water, and the head of the associated reservoir. Continuous chain of imaginary run-of-river plants is considered on the Sava river stretch (Croatia) from border with Slovenia to city of Sisak.



This work is licensed under a Creative Commons Attribution 4.0 License.
  • ISSN(Print): 1927-0569
  • ISSN(Online): 1927-0577
  • Started: 2011
  • Frequency: semiannual

Journal Metrics

(The data was calculated based on Google Scholar Citations)

h-index (July 2022): 19

i10-index (July 2022): 53

h5-index (July 2022): N/A

h5-median(July 2022): N/A

Contact