Assessment of Investment in Small Hydropower Plants
- Perica Ilak
- Slavko Krajcar
Abstract
In this study an assessment of investments in a hydropower plants is considered. The objective of this work is to maximize the net present value from selling energy. Because of the stochastic nature of river flows, flow duration curve is constructed to take into account hydropower plant capacity factor, important for the assessment of investment. Proposed mixed-integer linear programming model is flexible and accounts for nonlinear three-dimensional (3-D) relationship between the produced power, the discharged water, and the head of the associated reservoir. Continuous chain of imaginary run-of-river plants is considered on the Sava river stretch (Croatia) from border with Slovenia to city of Sisak.
- Full Text:
PDF
- DOI:10.5539/eer.v3n2p33
Index
- BASE (Bielefeld Academic Search Engine)
- Berkeley Library
- CNKI Scholar
- Copyright Clearance Center
- DTU Library
- Elektronische Zeitschriftenbibliothek (EZB)
- Excellence in Research for Australia (ERA)
- Harvard Library
- Library and Archives Canada(LAC)
- PKP Open Archives Harvester
- ROAD
- SHERPA/RoMEO
- Standard Periodical Directory
- UCR Library
- Ulrich's
- Universe Digital Library
- UoS Library
- WorldCat
- Zeitschriften Daten Bank (ZDB)
Contact
- Lesley LuoEditorial Assistant
- eer@ccsenet.org