Steam Power Plant Design Upgrading (Case Study: Khoms Steam Power Plant)
- Hesham G. Ibrahim
- Mokhtar S. Elatrash
- Aly Y. Okasha
Abstract
Built during the seventies and commissioned in 1980, Khoms Steam Power Plant consists of four units. A proposed design modifications based on Hysys simulation is to improve the overall efficiency, reduce gas emissions and lower operation and maintenance costs.
Five proposed modifications based on reduction of heat loss from the condenser and lowering heating rate reveal that a single open feedwater heater process is the optimum design modification of Rankine cycle to achieve the targeted objectives.- Full Text: PDF
- DOI:10.5539/eer.v1n1p202
This work is licensed under a Creative Commons Attribution 4.0 License.
Journal Metrics
(The data was calculated based on Google Scholar Citations)
h-index (July 2022): 19
i10-index (July 2022): 53
h5-index (July 2022): N/A
h5-median(July 2022): N/A
Index
- BASE (Bielefeld Academic Search Engine)
- CiteFactor
- CNKI Scholar
- Elektronische Zeitschriftenbibliothek (EZB)
- Excellence in Research for Australia (ERA)
- Genamics JournalSeek
- Google Scholar
- NewJour
- Norwegian Centre for Research Data (NSD)
- PKP Open Archives Harvester
- Publons
- ROAD
- SHERPA/RoMEO
- Standard Periodical Directory
- Ulrich's
- Universe Digital Library
- WorldCat
Contact
- Lesley LuoEditorial Assistant
- eer@ccsenet.org