Steam Power Plant Design Upgrading (Case Study: Khoms Steam Power Plant)
- Hesham G. Ibrahim
- Mokhtar S. Elatrash
- Aly Y. Okasha
Abstract
Built during the seventies and commissioned in 1980, Khoms Steam Power Plant consists of four units. A proposed design modifications based on Hysys simulation is to improve the overall efficiency, reduce gas emissions and lower operation and maintenance costs.
Five proposed modifications based on reduction of heat loss from the condenser and lowering heating rate reveal that a single open feedwater heater process is the optimum design modification of Rankine cycle to achieve the targeted objectives.- Full Text:
PDF
- DOI:10.5539/eer.v1n1p202
Index
- BASE (Bielefeld Academic Search Engine)
- Berkeley Library
- CNKI Scholar
- Copyright Clearance Center
- DTU Library
- Elektronische Zeitschriftenbibliothek (EZB)
- Excellence in Research for Australia (ERA)
- Harvard Library
- Library and Archives Canada(LAC)
- PKP Open Archives Harvester
- ROAD
- SHERPA/RoMEO
- Standard Periodical Directory
- UCR Library
- Ulrich's
- Universe Digital Library
- UoS Library
- WorldCat
- Zeitschriften Daten Bank (ZDB)
Contact
- Lesley LuoEditorial Assistant
- eer@ccsenet.org