Steam Power Plant Design Upgrading (Case Study: Khoms Steam Power Plant)


  •  Hesham G. Ibrahim    
  •  Mokhtar S. Elatrash    
  •  Aly Y. Okasha    

Abstract

Built during the seventies and commissioned in 1980, Khoms Steam Power Plant consists of four units. A proposed design modifications based on Hysys simulation is to improve the overall efficiency, reduce gas emissions and lower operation and maintenance costs.

Five proposed modifications based on reduction of heat loss from the condenser and lowering heating rate reveal that a single open feedwater heater process is the optimum design modification of Rankine cycle to achieve the targeted objectives.


This work is licensed under a Creative Commons Attribution 4.0 License.
  • ISSN(Print): 1927-0569
  • ISSN(Online): 1927-0577
  • Started: 2011
  • Frequency: semiannual

Journal Metrics

(The data was calculated based on Google Scholar Citations)

h-index (July 2022): 19

i10-index (July 2022): 53

h5-index (July 2022): N/A

h5-median(July 2022): N/A

Contact