Study on the Optimization of Aim-Oriented Construction Project’s Control System

Yu Wu, Baoyin Zhang, Bo Wang

Abstract


This paper analyzes the Time-Cost, Quality-Cost, Time-Quality aim optimization models of construction project, by studying on the aim system of construction project, and puts up an optimization model of Time-Quality-Cost.

Full Text: PDF DOI: 10.5539/ijbm.v3n8p39