Steam Power Plant Design Upgrading (Case Study: Khoms Steam Power Plant)

Hesham G. Ibrahim, Mokhtar S. Elatrash, Aly Y. Okasha

Abstract


Built during the seventies and commissioned in 1980, Khoms Steam Power Plant consists of four units. A proposed design modifications based on Hysys simulation is to improve the overall efficiency, reduce gas emissions and lower operation and maintenance costs.

Five proposed modifications based on reduction of heat loss from the condenser and lowering heating rate reveal that a single open feedwater heater process is the optimum design modification of Rankine cycle to achieve the targeted objectives.

Full Text: PDF DOI: 10.5539/eer.v1n1p202

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution 3.0 License.

Energy and Environment Research   ISSN 1927-0569 (Print)   ISSN 1927-0577 (Online)
Copyright © Canadian Center of Science and Education

To make sure that you can receive messages from us, please add the 'ccsenet.org' domain to your e-mail 'safe list'. If you do not receive e-mail in your 'inbox', check your 'bulk mail' or 'junk mail' folders.